savgroup.ae

Kiilto 60 Plus

Rapid floor screed for castings

A fast setting and drying floor screed for castings, fillings and slopes in interior areas. Approx. 11 litres mass/bag. Low alkali, cementitious.

Special features

 

  • fast, provides a surface ready to receive waterproofing, compressive strength > 30 MPa
  • floating castings, fillings, slopes, underfloor heating floors
  • coverage 1.9 kg/m²/mm
  • walkable: 1–2 h
  • coatable: 16 h
  • interior areas

Application

Special cement-based, fast setting and drying floor screed for castings, fillings and slopes at thicknesses 10–200 mm in interior areas. Carefully floated surface is suitable for waterproofing. For finishing the floor prior to the floor covering we recommend Kiilto levelling compounds. The concrete substrate must comply with national standards. (In Finland SisäRYL 2013 and BY 45).

1. Bonded floor/firm concrete subfloor: The substrate must be clean, solid and firm. Remove cement laitance, paint splashes, adhesive residue, etc., and brush or vacuum the floor thoroughly. Bond strength between the concrete subfloor and Pikalattiamassa floor screed is ensured by brushing a bond bridge on the floor before applying the floor screed. The bond bridge consists of a mixture of Kiilto 60 Plus (20 kg), Kiilto Fixbinder (1 l) and water (1.5 l). Kiilto 60 Plus is rubbed on the fresh bond bridge.

2. Floating construction/weak concrete subfloor and various construction plate substrates:
The cast is separated from the subfloor, for example, with Kiilto Valusuojakangas separation fabric or construction paper. The cast is detached from walls and inlets with separating boards/elastic sealant. The thickness of the cast shall be at least 50 mm reinforced construction (e.g., # 150 Ø 5). In underfloor heating floors, the cables/pipes are fixed in the concrete reinforcement.

Package Size

20 kg

EAN Code

6411512023205

Application temperature

Optimal +18–20 °C, minimum +10 °C

Bond strength

> 1 MPa, EN 13813

Classifications and certificates

CT-C30-F5 (EN13813), M1

Coatable

approx. 16 h

Compression strength

C30 (> 30 MPa), EN 13813

Coverage

1 mm layer/m² solid matter weighs approx. 1.9 kg (approx. 11 litres of screed/bag).

Fire class

A2fl-s1

Flexural strength

F5 (> 5 MPa), EN 13813

Layer thickness

10–200 mm

Max. grain size

approx. 3 mm

Mixing ratio

1.6–1.8 l water / 20 kg bag

Package sizes

20 kg bag

Shrinkage

Shrinkage < 0,5 ‰ ( +23 °C, 50 % RH )

Storage

In an unopened package, in a dry place 6 months.

Substrate humidity

concrete < 90 % RH

Type/binder

resin-cement-quartz sand-based powder

Walkable

1–2 h

Working time

approx. 30 min.

pH

< 11 (low alkali)

Instructions for use

 

Strew Kiilto 60 powder slowly in cool (+10–20 °C), clean water by mixing with a power mixer until a smooth, zero-slump mass is formed. Start spreading instantly. The mixing can be done also with a concrete mixer (mixing time approx. 3 minutes).

Apply Kiilto 60 Plus evenly by using a darby float and/or a wide steel trowel. Rub the surface with a steel trowel. The cast must be dry before finishing with a floor levelling compound. The drying of the screed must not be accelerated by heat or ventilation, since too quick a drying may cause hair cracks.

If the temperature in the levelled room is higher than normal, the relative humidity very low, or if the levelled floor surface is exposed to direct sunlight, we recommend covering the floor with a tarpaulin as soon as it is dry enough to allow walking. The floor should be covered with a flooring relatively soon after it has hardened and dried. This will prevent the surface from over drying, cracking and creating a weak bond. If the floor is not going to be coated within 2 weeks of levelling, it should be treated with curing agent or covered with plastic on the day following the levelling having been carried out, at the latest.

The waterproofing membrane/floor covering can be installed 16 h after spreading the screed; Keramix waterproofing membrane can be installed after only 4 h in optimal drying conditions
(20 °C, 50% RH). The screed will rapidly acquire good surface strength and will chemically absorb the amount of water stated in the instructions. Substrate’s high moisture content and poor drying conditions will retard the curing process. With regard to floor covering installation and substrate’s moisture specification, follow instructions given by RYL and the floor covering manufacturer. When assessing substrate’s coatability, take the entire structure into consideration.

On larger surfaces the need for movement joints shall be considered.
Not recommended for floors that are going to be painted.

Not recommended for applications where the parquet will be glued down onto the subfloor.

In areas where waterproofing is used, e.g., bathroom floors, the cast should be applied under the waterproofing membrane.

Not suitable for areas permanently under water (e.g., swimming pools).

Note! Using more water than instructed will retard the drying process and weaken the strength of the concrete. It may also cause separation and cracking.

Additional information

The information given in this product data sheet is based on our tests and our practical knowledge. The technical data is defined in standard conditions. Variations in local working conditions and methods will affect the product performance and result. We guarantee the high quality of our products according to our Quality Management System. No liability can be accepted from incorrect use of the product or prevailing conditions, over which we have no control. Thus, we cannot be held responsible for the final result. The correct use of the product presupposes that the user has made him/herself aware of the contents of the working instructions and procedure guide, if provided.

Environment and safety

Avoid unnecessary skin contact and exposure with the fresh product, use safety gloves. Refer to material safety data sheet. For information on product and package disposal, go to www.kiilto.com.

Discover More

Certificates

Open chat
Hello
Can we help you?